Design model of the First Street generator and electrical building and pump station, Miami Beach
First Street Neighborhood Improvement: Master Stormwater Pump Station
City of Miami Beach. Electrical and I&C engineer of record.
Electrical and instrumentation and controls design for a quintuplex master stormwater pump station with a 3.0 MVA standby generator, the highest-flow station in our portfolio.
- 200,000GPM
- 5pumps
- 3.0MVA generator
West Avenue Neighborhood Improvement, Phase II
City of Miami Beach, design-build. Electrical and I&C engineer of record.
Electrical and I&C design, permitting, and post-design services within a resiliency program that also raised roadways and replaced water and sewer systems. Scope includes a sextuplex master stormwater pump station, seven water quality well stations, a 1.25 MVA standby generator with a 5,000 gallon UL 142 fuel tank, RTUs, and SCADA.
- 120,000GPM
- 810HP sextuplex
- $105Mprogram value
Construction starting
Quebradillas WTP and RWI: Microgrid, Storage, and Substation
PRASA, Puerto Rico. Senior technical lead and electrical engineer of record.
Design delivered to PRASA with the 100% bid set, with construction about to begin. A $60M rehabilitation with a PV and battery storage microgrid and LUMA interconnection, a new 38 kV substation with a 300 m overhead line, and a new electrical room designed to be fully constructed before reconnection work begins. Voltage drop was analyzed across eight operating scenarios, with the governing case at 1.85% against LUMA's 3% limit. As part of the project, Green Dade performed a thermographic inspection of the raw water intake overhead distribution lines along 1.7 km to identify hot spots and deficiencies.
- 16MWh BESS
- 2,530+PV modules
- 38kV substation
- 1.7km thermographic inspection
- $60Mconstruction value
View 3D model Restricted access. Password required.
Vieques WWTP Distributed Electrical System
PRASA, Vieques, Puerto Rico. Electrical engineer of record.
A $20M island microgrid. The project includes a fully separate new electrical system, two generators, and medium voltage switchgear near the existing utility point of connection, so the transfer requires only a brief switchover. It also includes 8 MWh of battery storage, with capacity for expansion to 16 MWh.
- 8MWh BESS, expandable to 16 MWh
- 3,544PV modules, 2,536 new
- $20Mconstruction value
View 3D model Restricted access. Password required.
Out to bid
Las Bocas WTP Rehabilitation
PRASA, Barranquitas, Puerto Rico. Electrical, I&C, and SCADA engineer of record.
Complete electrical rehabilitation across the raw water intake, intermediate tank, and plant, including MCCs and generators. With a constrained electrical room, the design places the new MCC in a separate area so it can be built before the existing MCC is removed, keeping the plant in service. When the owner requested budget reductions, Green Dade separated required work from optional improvements and rescoped the project while preserving its core function.
- 3sites
- $21.8Mconstruction value
Out to bid
Las Marías Water Distribution System Improvements
PRASA, Las Marías, Puerto Rico. Electrical engineer of record.
Electrical design for ten pump stations and four storage tank sites in the Las Marías water distribution system, carried from 60 percent design through bid documents. Work includes electrical demolition, upgraded distribution, emergency generator integration, across-the-line and soft starters for pumps up to 40 HP, solar-powered area lighting and sensors at the tank sites, and LUMA coordination for service relocations and new service points.
- 10pump stations
- 4tank sites
Out to bid
Wastewater Pump Station Rehabilitation, North Region
PRASA, Vega Baja and Morovis, Puerto Rico. Electrical engineer of record.
Design-build rehabilitation of six wastewater pump stations: Villas de la Playa and Parcelas Márquez in Vega Baja, and Unibón 2, 3, and 4 and Valle Barahona in Morovis. Electrical scope covers the basis of design and preliminary design for service and power distribution, standby generators with automatic transfer switches, SCADA provisions, and hazardous location classification at each wet well.
Out to bid
Wastewater Pump Station Rehabilitation, Phase 1 North
PRASA, Morovis, Florida, Lares, and Toa Alta, Puerto Rico. Electrical engineer of record.
Rehabilitation of four wastewater pump stations: Cruz Rosario, Las Vegas, Palmas del Sol, and Piñas. Green Dade took over the electrical design at 90 percent, resolved PRASA review comments, and completed the signed and sealed 100 percent construction documents, including the electrical service improvements submitted for LUMA certification.
Local Wastewater Pump Stations
Miami-Dade Water and Sewer Department. Electrical engineer of record.
Rehabilitation and upgrade of local wastewater pump stations with new services, control panels, RTUs, SCADA, and permanent generators, with equipment designed to FEMA flood criteria.
Pump stations assessed across Miami-Dade County under multiple contracts
Pump Station Arc Flash and Coordination Program
Miami-Dade Water and Sewer Department
Field data collection, fault current verification with FPL, arc flash models, site reports, and NFPA 70E compliance documentation across the department's pump station network.
Smart City and Lighting, Phase 1C
City of Miami Beach. Lighting engineer of record, QA/QC manager, and CEI project manager.
Part of the city's $25M Smart City Lighting initiative, launched after a citywide photometric study found most roadways outside illuminance and uniformity standards. Green Dade prepared retrofit plans for more than 1,000 poles, completed the Lighting Design Analysis Report, and integrated a new lighting management system for power control, dimming, and monitoring, following the city's approved product list.
In construction, Green Dade provides CEI services: daily inspections, schedule of values and cost tracking, RFI management, lighting control node installation and testing, and resident coordination. Earlier program phases, led by Green Dade's principal, produced the citywide lighting inventory, the Lighting Master Plan, and the city's approved product list.
- 1,004poles retrofitted
- $3.5MPhase 1C construction
- $25Mcitywide program
Intersection and Lighting Improvements
Miami-Dade County DTPW, Highway Engineering Division. Lighting engineer of record.
Lighting design for six work orders under the county's intersection and pedestrian safety contract: three signalized intersections in Miami Lakes and northwest Miami-Dade, decorative corridor lighting on NW 18 Avenue and NW 46 Street, and a midblock crosswalk on Brickell Key. Designs follow FDOT lighting criteria and combine new conventional poles, LED retrofits of existing poles, teardrop decorative lighting, and FPL lighting as each location required, coordinated with the City of Miami, the Town of Miami Lakes, and FPL. At Cow Pen Road and Miami Lakes Drive, Green Dade redesigned the intersection lighting with all new poles at the Town's request.
- 6work orders
- 3signalized intersections
- $5Mconstruction value
MSC Cruise Terminal: Peer Review and Utility Assessment
PortMiami. Electrical manager, electrical reviewer, and QC manager: Edmundo Rodriguez, P.E.
Electrical review within an independent A&E peer review of the new MSC terminal at Berth 8, the combined concourse to Berth 9, building additions, and site improvements. The work continued with a preliminary utility assessment for the future Berth 10 expansion, comparing existing capacity with projected demand and identifying connection points and required upgrades.
- $414Mterminal construction
- 3berths
MIA Terminal-Wide Reroofing and Lightning System Upgrades
Miami-Dade Aviation Department. MEP lead and electrical and communications engineer of record: Edmundo Rodriguez, P.E., principal experience prior to Green Dade.
Program verification and schematic design for reroofing the North, Central, and South Terminals at Miami International Airport, across 24 roof sectors from 3,000 to more than 40,000 SF. Work included field verification of above-roof and above-ceiling conditions, inventory and impact tracking of roof-mounted MEP equipment, baseline BIM and 3D mapping, code compliance reviews under NEC, NFPA, FBC, FAA, and TSA requirements, and sequencing plans to keep terminal operations running during construction.
- 24roof sectors
- 3terminals
- $180Mestimated construction
Fleet EV Charging Stations
Miami-Dade County Department of Solid Waste Management
Concept design through construction management for new dedicated services and Level 2 charging at two sites, including FPL coordination, paving, striping, bollards, and signage.
- 10vehicles per site
- 2sites
Public Housing Electrical Recertifications
Miami-Dade County Public Housing and Community Development
Inspections, deficiency reports, and repair design for distribution, grounding, and overcurrent protection at multifamily sites including Little Havana Homes and Lemon City.
Project 3D model of the CP-1 pump room showing five pumps with suction and discharge piping
Ongoing
CP-1 Booster Pump Station
Miami-Dade Water and Sewer Department
I&C, HVAC, and plumbing design for a wastewater booster pump station with variable frequency drive pumps and WASD SCADA integration.
Ongoing
MBPD CCTV and Fiber Infrastructure
City of Miami Beach Police Department. Lead designer, engineer of record, and project manager.
Progressive design of the police department's citywide CCTV and communications network: a fiber optic backbone, conduit systems, communications cabinets, load centers, and camera poles in parks, commercial corridors, and along the beachwalk. Services include site investigation, utility coordination, permit-ready construction documents to FDOT specifications and City standards, and support through permitting, bidding, and construction, with provisions for future smart city expansion.
- 7+miles of fiber backbone
- 80+facilities connected