First Street Master Stormwater Pump Station
City of Miami Beach. Electrical and I&C engineer of record.
Quintuplex master stormwater pump station with a 3.0 MVA standby generator, the highest-flow station in our portfolio.
- 200,000GPM
- 3.0MVA generator
